Контрактное производство электроники под ключ в Китае
Шэньчжэнь, район Баоань, улица Фуюн, улица Фуцяо, район 3, промышленный парк Лонгхуй 6
9:00 - 18:30, Пн - Сб. (GMT+8)
Промышленные новости

Промышленные новости

How to control FPC cost and size stability
08Feb
Hey 0 Замечания

How to control FPC cost and size stability

In recent years, with the rapid development of PCB manufacturing process, the industry has put forward higher requirements for FPC. Precision PITCH is the main breakthrough direction of FPC in the future.

How to choose hot melt adhesive for patch processing
08Feb
Caddy 0 Замечания

How to choose hot melt adhesive for patch processing

How to choose hot melt adhesive and hot melt adhesive use points for attention: first, the color of the adhesive, second, followed by surface treatment, three, working time, four, temperature resistance, five, viscosity

PCB industry reshuffle accelerates
07Feb
Hey 0 Замечания

PCB industry reshuffle accelerates

Most of the existing sites of manufacturers are small, and the investment amount is also relatively large, so that many small and medium-sized PCB enterprises to introduce robots to complete the automation hope and stop.

Development of FPC flexible circuit board
07Feb
Hey 0 Замечания

Development of FPC flexible circuit board

With the continuous advancement of information and intelligent construction, the market demand for flexible circuit boards will be more and more large.

The reason analysis and control improvement of soft - hard combination board
07Feb
Hey 0 Замечания

The reason analysis and control improvement of soft - hard combination board

The expansion and shrinkage of flexible plate materials are mainly related to matrix material PI and glue. The higher the degree of iminization, the stronger the controllability of expansion and shrinkage.

Why is PCB data management important
07Feb
Kim 0 Замечания

Why is PCB data management important

Development times must be as short as possible, so these competitors have little warning that new products will appear that they need to analyze, understand, and copy to make this window larger.

The accelerated development of PCB industry
07Feb
Hey 0 Замечания

The accelerated development of PCB industry

No matter how developed the market is, PCBS are the most frequently used demand in production and an integral part of the electronics industry.

Explain the difference between single-layer FPC, double-sided FPC and multi-layer FPC
07Feb
Hey 0 Замечания

Explain the difference between single-layer FPC, double-sided FPC and multi-layer FPC

The market direction of PCB is almost a bellwether of the electronics industry. As demand for flexible boards grows, PCB manufacturers are accelerating the development of thinner, lighter and denser PCB,

How to improve the quality of patch processing
07Feb
Caddy 0 Замечания

How to improve the quality of patch processing

Reduce the cost method: first, pay close attention to the cost of external maintenance costs or internal maintenance costs, no matter spare parts or assets depreciation, sample patch processing manufacturers should set a constantly reducing standard, seco

Select high quality SMT manufacturers
07Feb
Caddy 0 Замечания

Select high quality SMT manufacturers

In the operation, electrostatic protection is a very important work, can not be careless, we should do several points: 1, ground wire, 3, the use of ion fan, 4, cleaning, 5, warning signs, 6, the use of part of the equipment, need written consent, seven,

How to quote SMT patch processing quotation sheet
07Feb
Caddy 0 Замечания

How to quote SMT patch processing quotation sheet

Is the use of AOI, to ensure the inherent quality of SMT products, while parametric automatic optical detection device to fill this gap, whether you choose image comparison for low capacity mount, or choose parametric mount for medium-high capacity mount,

How to maintain SMT mounter regularly
07Feb
Caddy 0 Замечания

How to maintain SMT mounter regularly

How to maintain SMT mounter regularly:2. Wait until the origin and remove the waste component box. Push the "HEAD SERVO" to OFF and then Nozzle off. 3. Turn the head between positions 7 and 8 using the manual handle. 4. Use a mirror to place it ...

Достаточно загрузить файлы Gerber, BOM и проектные документы, и команда KINGFORD предоставит полное предложение в течение 24 часов.