Контрактное производство электроники под ключ в Китае
Шэньчжэнь, район Баоань, улица Фуюн, улица Фуцяо, район 3, промышленный парк Лонгхуй 6
9:00 - 18:30, Пн - Сб. (GMT+8)
Проектирование печатных плат
Проектирование печатных плат
​Circuit board factory explains the design of high-quality PCB circuit board Part II
12-032022
Andy 0 Замечания

​Circuit board factory explains the design of high-quality PCB circuit board Part II

Circuit board factory explains the design of high-quality PCB circuit board Part II

Circuit board assembly, circuit board design, and circuit board processing manufacturers explain high-quality PCB circuit board design Part II

2.1. Wiring "Aesthetics"

When turning, avoid right angles and try to use oblique lines or arcs for transition.

The routing shall be orderly and arranged in a centralized manner by category, which can not only avoid mutual interference of signals of different properties, but also facilitate inspection and modification. For digital systems, there is no need to worry about interference between signal lines (such as data lines and address lines) of the same camp, but control signals such as read, write, and clock should be independent and protected by ground wires.

When laying the ground in a large area (further discussed below), the ground wire (actually, it should be the ground "surface") and the signal wire should be kept at a reasonable and equal distance as far as possible, and should be as close as possible under the premise of preventing short circuit and electric leakage.

For weak current system, the ground wire and power line shall be as close as possible.

For the system using meter sticker components, the signal lines shall be all on the front as far as possible.

2.2. Ground wire layout

There are many discussions about the importance and layout principle of ground wire in the literature, but there is still a lack of detailed and accurate introduction about the actual layout of ground wire in pcb. My experience is that in order to improve the reliability of the system (rather than just making an experimental prototype), no matter how much emphasis is placed on the ground wire

Not too much, especially in weak signal processing. To this end, we must spare no effort to implement the principle of "covering a large area of land".


PCB circuit board design


When paving, it must generally be grid shaped, except for those scattered sites separated by other lines. The heating performance and high-frequency conductivity of the grid ground are much better than the whole ground wire. In double-sided board wiring, sometimes the ground wire has to be separated in order to run the signal line, which is extremely unfavorable for keeping the ground resistance low enough. Therefore, we must adopt a series of "smart" means to ensure the "smooth" of the ground current. These techniques include:

Surface mount components are widely used to eliminate the space occupied by welding holes that should belong to the ground wire.

Make full use of the front space: In the case of a large number of surface mounted components, try to make the signal wire go to the top as far as possible and give the bottom layer to the ground wire "selflessly", which involves countless small tricks. There is a trick in my book "One of the pcb design skills: Switching pins", and many similar spells, which will be written one after another.

Reasonably arrange the signal lines, and give the important areas on the board, especially the "hinterland" (which is related to the communication of the whole board ground wire) to the ground wire. As long as carefully designed, this can be achieved.

Coordination between the front and the back: Sometimes the ground wire is "desperate" on one side of the board. At this time, try to make the wiring on both sides coordinate with each other. "There is no need to leave the master here, but there is a place to leave the master". A sufficient area is vacated at the corresponding position on the back to lay the ground wire, and then through the vias with sufficient number and reasonable location (considering the large resistance of the vias)? quot; The bridge "connects the two sides of the Taiwan Strait, which are forcibly divided by the signal lines passing across but are reluctant to give up and hope for reunification, into a whole with sufficient conductivity.".

How to jump over the wall in a hurry: When the huge ground wire is cut off by only one signal wire, let the signal feel a little aggrieved and take the jumper wire. Sometimes, I am not reconciled to just pulling a bare wire, and this signal happens to pass through a resistor or other "long leg" devices, so I can rightfully extend the pin of this device, so that it can also act as a jumper wire, which not only passes the signal, It also avoids the shameful name of jumper wire: - (Of course, in most cases, I can always let such signals pass through the right place to avoid crossing with the ground wire. The only thing I need is observation and imagination.

Minimum principle: the path of ground current should be reasonable, and large current and weak signal current should never go forward side by side. Sometimes, if a reasonable path is selected, the ground wire of a platoon is equal to that of a group army with unreasonable configuration.

Finally, by the way, there is a famous saying: "You can trust your mother, but never trust your land". In the case of extremely weak signal processing (below microvolt), even if the ground potential is consistent by any means, the ground potential difference of key points on the circuit will still exceed the amplitude of the signal being processed, at least by the same order of magnitude. Even if the static potential is appropriate, the instantaneous potential difference may still be large. For such occasions, first of all, make the circuit work as independent of the ground potential as possible in principle. Circuit board assembly, circuit board design, and circuit board processing manufacturers explain the second part of high-quality PCB circuit board design.

Достаточно загрузить файлы Gerber, BOM и проектные документы, и команда KINGFORD предоставит полное предложение в течение 24 часов.